Diston Wastewater Technology

Education

Devon Meadows Primary School

Client

Outdoor Education Group

Location

Devon Meadows VIC

Wastewater Treatment Plant Loading

7,300L/day 6,700grams BOD/day

Completion Date

2013

Devon Meadows Primary had a sand filter which had reach end of life and was leaching into the ground water system with surfacing on the oval. DWW obtained an EPA works approval, designed and constructed a treatment plant. A deep sewer invert was installed with a gravity sewer network around the whole school to cut out a lot of maintenance and potential health risks associated with the existing make ship pump wells around the school.