Agreed Maintenance Schedule
Upon installing a Diston WasteWater Technology STP, a 12 month warranty is given which includes a regular, agreed upon general maintenance schedule of the plant, ensuring that your treatment plant is kept in optimal condition.
Continuity of Service
Following this 12 month warranty period, Diston WasteWater can arrange a contractual maintance schuedule if required, ensuring a continuity of service by the ones who know your plant best.
Basic on-site training is given to the officer designated to oversee the treatment plant, ensuring they can quickly and easily identify any anomolies registering on the system. In case of emergency contact flood damage restoration San Diego or we can assist over the phone or, if a call out is required, be on site within 48 hours.