Location

Great Ocean Road, Victoria

Client

BIG 4

Waste Water Treatment Plant Loading

35,000  litres/day & 14,000g of BOD/day

Year

2007

Wye River Caravan Park

Under the guidance of EPA Works Approval Diston Waste water installed a staged sewage treatment system that can be easily upgraded in the future.

With absolute beach frontage and powered sites the camping ground is open from Melbourne Cup weekend in early November until the end of April.

The beach is patrolled over summer and provides great, swimming, surfing and fishing; with bush walking next door and Lorne and Apollo Bay 25 mins away.  Cape Otway, 12 Apostles, waterfalls and Otway Fly are all a comfortable day trip away.

diston-wastewater-footer

Quality-assured50 YEARS EXPERIENCE

ACCREDITED COMPANY (ISO 9001, ISO 14001 & AS/NZS 4801) WITH EPA APPROVED SYSTEMS THE ONLY

WASTE WATER COMPANY WITH BOTH CERTIFIED ENGINEERS & LICENSED PLUMBERS